CYBERLYNK
page-banner-shape-1
page-banner-shape-2

Remote SCADA Integration at Vendor FAT

About Project

CYBERLYNK enabled secure SCADA integration between a system located in Germany and a machine at a vendor FAT site in the USA. By testing SCADA interfaces remotely during FAT, critical integration work was completed earlier in the project, reducing international travel and de-risking the overall project.

The Challenge

SCADA integration is traditionally performed on site or requires specialist engineers to travel to vendor FAT locations. This approach increases project cost, limits testing flexibility, and delays the identification of integration issues until later in the project lifecycle.

Project Info

  • Client:

    SCADA Vendor

  • Project Stage:

    Factory Acceptance Testing (FAT)

  • Locations:

    Germany ↔ USA

  • CYBERLYNK Role:

    Pre-SAT Remote Integration

The CYBERLYNK Approach

Using CYBERLYNK, the SCADA system in Germany was securely connected to a machine located at a vendor FAT site in the USA. This enabled full remote SCADA interface integration testing — including PackML driver development — without requiring the SCADA engineer to travel.

Remote Integration Testing Performed
Outcomes & Business Impact

Time Saved:

3 weeks

Reduced installation downtime:

50%